Guide
2026 Amendment to the Building Code: Checklist for Thermal Insulation Projects
The 2026 amendment to the Construction Law won’t change how well polystyrene or wool conduct heat. It may, however, change something less pleasant: who inspects insulation work and what documents a company must have on-site. If your team is taking on another contract assuming that the regulations are the same as they were a year ago, the risk lies not in the materials, but in the paperwork and liability.
We have two pieces of legislation and several deadlines. The amendment of July 31, 2026 (Journal of Laws, item 1161) and the earlier amendment of December 23, 2025 (Journal of Laws, item 1847), which takes effect in stages: January 1, January 7, and September 20, 2026. In addition, there is a transitional provision for projects submitted before the amendment, and the construction log, which will remain in paper form until December 31, 2031.
Instead of summarizing the regulations—which you’ll have to read in the PDF anyway—we’ve prepared a checklist. We’ll go over acceptance procedures, documentation, dates, the scope of liability in the contract, and revised definitions. You’ll be able to see what to compare with your own documentation before signing your next contract.
The assumption that „nothing has changed” costs more than reviewing the documents
The amendment of July 31, 2026 (Journal of Laws 2026, Item 1161) was published on September 1, 2026. Page Journal of Laws It provides only the title, date, and a link to the PDF file; it does not describe the changes. Therefore, conclusions must be drawn from the original text, not from the commentary.
Contractors specializing in insulation may not need to be familiar with the entire law. They need to know three things: who inspects their work, what documents they must leave on the construction site, and what their responsibilities are under the contract. Amendments most often affect precisely these areas.
The source materials provide no confirmation that the process for accepting work or the list of construction documents is changing. Therefore, this text takes the form of a checklist: it shows what to compare in your own situation, rather than summarizing regulations whose content has not been verified. The headline about „less red tape” and construction projects without prior notification remains just a headline. Until the act is read, it is unclear which structures and procedures it applies to.
Assuming that „everything will stay the same here” is risky when a company begins a new contract after the amendment takes effect. It takes an hour to check. Correcting documentation after acceptance costs time and money.
Two acts and a few dates: Item 1847 vs. Item 1161
Since assuming there will be no changes is risky, let’s clarify the laws themselves. There are two, not one. The amendment of December 23, 2025 (Journal of Laws, item 1847) takes effect in stages: January 1, 2026, January 7, 2026, and September 20, 2026, according to the presentation by the County Building Supervision Inspectorate on February 20, 2026. Amendment of July 31, 2026 (Journal of Laws 2026, Item 1161) It pertains to the Act on Professional Associations of Architects and Civil Engineers and the Construction Law. It was published on September 1, 2026.
The title of the act alone does not indicate what changes it makes to permits and documentation. Before drawing any conclusions, read the PDF of the act from the Journal of Laws and the current consolidated text of the Building Code in ISAP.
Within the company, distinguish between two issues. The transitional provisions for projects submitted before the amendment took effect constitute one set of rules. Contracts that begin after the effective date constitute another. Each has a different set of documents.
Only by comparing both acts with your own documentation will you be able to determine whether the amendment affects a specific construction project. Relying solely on headings and summaries can lead to erroneous conclusions in the contract.
Item 1: Who inspects and accepts the insulation work, and on what basis?
Once you know which legal framework applies to the project, the first question is: who accepts the work? Specify in writing who serves as the investor’s supervision inspector and what their authority is. This determines whose entries are binding and who signs the report.
Check the date the building permit application or notification was filed. That date determines whether the project is subject to the existing regulations or the new ones. The date the decision was issued is irrelevant here.
Acceptance documentation consists of stage-by-stage acceptance reports, statements of conformity for the materials used, and declarations of performance for polystyrene, XPS, and insulation wool. In the report, record the thickness of the layers and the method of installation, because without this information, the final acceptance inspection will turn into a dispute.
Also determine whether the acceptance covers only the insulation layer or the entire cladding system, including the plaster and finish. The difference in the cost of corrections can be significant. The scope must be specified in the acceptance report.
If the object is single-family residential building, a multi-family residential building, or a shelter—before obtaining a quote, confirm whether the change in legal status affects the construction process.
Item 2: Construction Site Documentation—Paper Construction Log or EDB
Now that we know who is taking delivery of the work, it’s time to address what remains on the construction site. The paper-based construction log remains valid until December 31, 2031 (Article 47a of the Construction Law, PINB presentation of February 20, 2026). At the same time, the Electronic Construction Log in the GUNB system is operational and, for now, is optional: The EDB application is free of charge. The requirement is set to take effect at a later date. GUNB cites January 1, 2032, but this date must be confirmed in the text of the statute, not in a press release.
Designate one person within the company to manage entries, one to provide data, and a list of individuals with access to the EDB, if an investor or supervisory inspector is already using it. Access is granted by the investor and includes the construction manager, the designer, and the client's representative. Having two people keeping the log is a recipe for discrepancies.
Verify the consistency of the three documents: the records detailing the installation of the insulation and the materials used, the acceptance reports, and the scope of the contract. Discrepancies in layer thickness between these sources are a common point of contention.
The absence of an entry regarding the installation of the thermal insulation layer or a stage-by-stage acceptance often becomes an issue during final acceptance. The entry must be made on the day the work is performed, not after it is completed.
Item 3: Transitional Provision—that is, a bill submitted before the amendment
Now that you know how to document the work in the logbook, move on to the question that comes before the final inspection: what is the legal basis for this project?.
For a project for which a building permit application or notification was submitted before the amendment took effect, the previous regulations apply. This transitional rule is outlined in the PINB presentation dated February 20, 2026. Check the date the application or notification was submitted, not just the date the permit was issued. The transitional regime is typically determined by the earlier of these two dates.
In practice, two procedures may apply to a single construction site: one phase began before the deadline, and the other after it. This also applies to the scope of documentation and the acceptance process.
If you are working as a subcontractor, ask the general contractor for written confirmation of the legal basis for the project and which regulations apply to the final acceptance. Record this information in the project files. In the event of an inspection or dispute, it is the document that counts—not a verbal assurance that „the project is old.”.
Item 4: Deadlines for the Company Calendar
Since the transitional provision determines which regulations you must follow, enter the dates on which the contractual regime changes into your company’s calendar. The amendment of December 23, 2025 (Item 1847) takes effect in stages: January 1, 2026, and January 7, 2026, are the first stages, so some of the changes are already in effect as of the beginning of the year. The next phase is scheduled for September 20, 2026; according to a PINB presentation, it concerns, among other things, certain definitions that have been added or clarified, including single-family residential buildings, multi-family residential buildings, and carports.
Make a separate note of September 1, 2026: this is the date of publication of the act dated July 31, 2026 (Journal of Laws 2026, Item 1161). Do not rely on press reports for the date it takes effect; instead, refer to the text of the act itself.
Each of these dates marks a separate cutoff point, as it changes the rules for contracts signed before and after that date. A contract signed in August and one signed in October may be subject to different rules, even if they involve the exact same insulation work.
Keep a simple table: date, project, what it’s about, who’s responsible, document to be reviewed. Without it, the list of dates stays in the email and doesn’t work.
Item 5: Scope of Liability in the Agreement with the Investor
Once you've determined which regulations apply to a given project, check what exactly you're promising the investor in the contract.
Clearly specify who is responsible for ensuring that the documentation complies with regulations: the developer, the designer, or you as the insulation contractor. The default regulations do not always rule in the contractor’s favor, and disputes following final acceptance are rarely resolved on technical grounds.
Clarify the scope of responsibility: just the insulation layer, or the entire system, including the plaster and facade finish? The cost of fixing the insulation and the cost of repairing the loose plaster on the entire wall are on two different scales.
List the documents to be provided upon completion of the work: declarations of performance, technical data sheets, acceptance reports, and the format in which they will be provided (paper or electronic). Without this provision, the client may request an electronic version during the acceptance process.
Also document the procedure in case regulations change during the project: who bears the cost of updating the documentation and who is responsible for any missing entries in the construction log. Avoid phrases such as „in accordance with applicable regulations” without specifying the exact wording and date. Such a reference does not protect the contractor if regulations change during the course of the work.
Item 6: Revised definitions and their implications for thermal insulation
Section 5 concludes the contractual provisions, but their content depends on how the structure is classified. This is where the definitions come into play. According to available analyses, the amendment of December 23, 2025, (Item 1847) adds or clarifies certain terms, including “single-family residential building,” “multi-family residential building,” and “carport.” Some of these provisions take effect on September 20, 2026.
This classification determines whether the project requires a permit, a notification, or neither. This, in turn, determines the scope of documentation, inspections, and liability. A practical tip for insulation companies: ask about the building’s formal status before providing a quote. Otherwise, you might quote for one procedure but end up having to complete another.
If a project begins after September 20, 2026, do not assume that „shed” or „single-family dwelling” mean the same thing as they did in the old wording. The definitions change the official classification, not the structure or insulation technology. Check the consolidated text of the Building Code in ISAP: the definitions are scattered across successive amendments, and it’s easy to overlook one when analyzing a contract.
Regulations and Material Properties: Styrofoam, XPS, and Wool Remain Unchanged
The new definitions change the classification of a building, not its construction. The same applies to the materials: the amendments in question do not affect the physical properties of EPS, XPS, or mineral wool. The same product, the same declaration of performance (DWU), and the same rules for selecting thickness.
Regulations may change who inspects the work and what documents are required. They do not change which tool should be used to cut insulation. This distinction prevents the redesign of insulation technology in response to changes that do not affect it.
Tools are selected based on the material and thickness: thermal cutters for EPS and XPS, equipment for mineral wool, facade rasps, and abrasives. The wording of the Building Code is irrelevant here. The differences between cutting EPS and XPS are described in the section on thermal cutters for polystyrene, along with a step-by-step guide on how to thermally cut polystyrene.
If the acceptance inspection requires verification of layer thickness and surface evenness, plan the inspection method before starting. Correcting unevenness after a phased acceptance inspection results in a waste of material and time. Separately, keep a close eye on the material documentation: the DWU and technical data sheets must match what actually arrived at the construction site, as this is verified during acceptance.
Pre-Season Checklist: What to Do at Work
The insulation technology remains the same, but the administrative side needs to be sorted out before the season starts. Here is a list of five steps.
- List the contracts for the upcoming season, including three dates: the date of submission of the application or notification, the date the contract is signed, and the planned start date of the work. Without them, you won’t be able to establish the legal framework for the project.
- For each project, determine whether you are proceeding under the existing regulations or the new ones. Record this in a note in the case file. This determination must be reproducible, independent of any one person’s memory.
- Review the templates for contracts and acceptance reports. Check the references to regulations and the provisions regarding responsibility for documentation. Old templates usually no longer apply here.
- Establish a single standard for the construction log: paper or electronic (EDB), who enters the entries, who keeps a copy, and how the data is transferred. The paper version is valid through December 31, 2031, so both formats will coexist.
- Plan a brief training session for the crews. The goal isn't to go over regulations, but to explain what records, confirmations, and material documents they need to collect on an ongoing basis at the construction site.
Takeaways: Three Things to Check This Week
Following the team training, there are three decisions to be made this week.
- Read the primary sources. The PDF of the act from the Journal of Laws 2026, item 1161, and the current consolidated text of the Construction Law in ISAP—not newspaper headlines. That’s the only place where you’ll find the effective date and the scope of the changes.
- Verify the transitional rule. For each active contract, determine whether the application or notification was submitted before the deadline. A contract signed before that date and one signed after it entail two different sets of obligations. Record your findings in the project file.
- Establish a standard for documentation. One method of maintaining a construction log—either on paper or electronically (EDB)—along with a complete set of acceptance reports and material declarations. The paper log is valid through December 31, 2031; the electronic version (EDB) is optional, so prepare your company for both formats.
This is for informational purposes only and does not constitute legal advice. Before making a contractual decision, consult an attorney and review the consolidated text; laws and deadlines are subject to change.
Conclusion
The 2026 amendment to the Construction Law does not change the physical properties of polystyrene foam, XPS, or insulation wool, but it does change the way thermal insulation projects are accepted, work is documented, and responsibility is assigned. Three decisions remain crucial: distinguish between item 1847 and item 1161, set a cutoff date for each contract, and choose a single standard for the construction log—either paper or EDB. Added to this are the provisions in the contract with the investor and the ongoing collection of material declarations by the work crews. Don’t wait for an inspection. This week, review active projects, update contract templates, and schedule a brief training session. Treat this checklist as an implementation plan, not a document to be filed away. Well-organized documentation before the season starts means fewer disputes, smoother project acceptance, and predictable work on the construction site.